| Organisation Chain |
TNEB Limited||TANGEDCO||CE-NCTPS-I - TANGEDCO||SE-Mechanical Maintenance I-NCTPS-I - TANGEDCO |
| Tender Reference Number |
CE SE MI NCTPS I 225 24 25 |
| Tender ID |
2024_EB_508523_1 |
Withdrawal Allowed |
No |
| Tender Type |
Open Tender |
Form Of Contract |
Works |
| Tender Category |
Works |
No. of Covers |
2 |
| General Technical Evaluation Allowed |
No |
ItemWise Technical Evaluation Allowed |
No |
| Payment Mode |
Online |
Is Multi Currency Allowed For BOQ |
No |
| Is Multi Currency Allowed For Fee |
No |
Allow Two Stage Bidding |
No |
|
|
|
|
|
| 1 |
Fee/PreQual/Technical |
EMD |
.pdf |
|
|
TECHNICAL AND COMMERCIAL |
.pdf |
| 2 |
Finance |
PRICE BID COVER |
.xls |
|
|
|
|
|
| |
|
|
| |
| Tender Fee in ₹
|
0.00 |
| Fee Payable To |
Nil |
Fee Payable At |
Nil |
| Tender Fee Exemption Allowed |
No |
|
|
| EMD Amount in ₹
|
65,800 |
EMD Exemption Allowed |
Yes |
| EMD Fee Type |
fixed |
EMD Percentage |
NA |
| EMD Payable To |
Nil |
EMD Payable At |
Nil |
| BG Required |
No |
| Minimum Direct EMD Payment in ₹ |
0.00 |
|
|
|
| |
|
|
| |
| Title |
NCTPS I SE MI circle Mill Plant Maintenance Division Annual Overhaul works for the year 24 25 Specification No 225 24 25 |
| Work Description |
NCTPS I SE MI Circle AOH 24 25 MPM Dn Unit III Replacement of insulation in the Hot air duct for mills 3A to 3F including supply of necessary insulation GI sheet and consumables during the modular replacement of duct Existing insulation removal |
| NDA/Pre Qualification |
Please refer Tender documents. |
| Independent External Monitor/Remarks |
NA |
| Tender Value in ₹ |
NA |
Product Category |
Power/Energy Projects/Products |
Sub category |
NA |
| Contract Type |
Tender |
Bid Validity(Days) |
180 |
Period Of Work(Days) |
60 |
| Location |
Works |
Pincode |
600120 |
Pre Bid Meeting Place |
NA |
| Pre Bid Meeting Address |
NA |
Pre Bid Meeting Date |
NA |
Bid Opening Place |
O/o SE MI NCTPS1 CH 120 |
| Should Allow NDA Tender |
No |
Allow Preferential Bidder |
No |
| Enable Media Publish Date |
No |
Enable Tender Bulletin Date |
No |
|
| |
| Published Date |
07-Dec-2024 06:45 PM |
Bid Opening Date |
13-Dec-2024 02:30 PM |
| Document Download / Sale Start Date |
07-Dec-2024 06:50 PM |
Document Download / Sale End Date |
12-Dec-2024 02:00 PM |
| Clarification Start Date |
NA |
Clarification End Date |
NA |
| Bid Submission Start Date |
07-Dec-2024 06:55 PM |
Bid Submission End Date |
12-Dec-2024 02:00 PM |
|
|
|
| NIT Document |
| 1 |
Tendernotice_1.pdf
|
NCTPS I SE MI Circle AOH 24 25 MPM Dn Unit III Replacement of insulation in the Hot air duct for mills 3A to 3F including supply of necessary insulation GI sheet and consumables during the modular replacement of duct Existing insulation removal during the
|
769.02
|
|
|
Download as zip file
|
| Work Item Documents |
| 1 |
BOQ |
BOQ_604900.xls
|
NCTPS I SE MI Circle AOH 24 25 MPM Dn Unit III Replacement of insulation in the Hot air duct for mills 3A to 3F including supply of necessary insulation GI sheet and consumables during the modular replacement of duct Existing insulation removal during the |
280.00 |
|
|
|
| |
| Name |
SE MI NCTPS1 CH 120 |
| Address |
O/o SE MI NCTPS1 CH 120 |
|
| |
|
|
| |