Organisation Chain Kerala State Electricity Board||Chief Engineer (Distribution Central)||Dpty Chief Engg Electrical Circle Alappuzha
Tender Reference Number Dyuthi2-Package3
Tender ID 2025_KSEB_741010_1 Withdrawal Allowed Yes
Tender Type Open Tender Form Of Contract Turn-key
Tender Category Works No. of Covers 2
General Technical Evaluation Allowed No ItemWise Technical Evaluation Allowed No
Payment Mode Online Is Multi Currency Allowed For BOQ No
Is Multi Currency Allowed For Fee No Allow Two Stage Bidding No
 
Online Bankers
S.No Bank Name
1 SBI MOPS
Cover No Cover Type Description Document Type
1 Fee/PreQual/Technical Bid documents .pdf
Tech specifications .pdf
GTP .pdf
NIT .pdf
2 Finance BOQ .xls
 
 
 
Tender Fee in ₹ 5,900
Fee Payable To Nil Fee Payable At Nil
Tender Fee Exemption Allowed Yes
EMD Amount in ₹ 50,000 EMD Exemption Allowed Yes
EMD Fee Type fixed EMD Percentage NA
EMD Payable To Nil EMD Payable At Nil
 
 
Title Dyuthi II Summer Scheme 2025 Package 3 Design Manufacture Supply Laying Testing and Commissioning of 11kV XLPE Under Ground cable 3Core 300sqmm Dry Cure type at different locations under Electrical Circle Alappuzha on TURNKEY basis
Work Description Dyuthi II Summer Scheme 2025 Package 3 Design Manufacture Supply Laying Testing and Commissioning of 11kV XLPE Under Ground cable 3Core 300sqmm Dry Cure type at different locations under Electrical Circle Alappuzha on TURNKEY basis
NDA/Pre Qualification As per tender documents
Independent External Monitor/Remarks NA
Tender Value in ₹ 1,43,02,701 Product Category Electrical Works Sub category NA 
Contract Type Tender Bid Validity(Days) 180 Period Of Work(Days) 90 
Location Under Electrical Circle Alappuzha Pincode 688007 Pre Bid Meeting Place Electrical Circle Alappuzha 
Pre Bid Meeting Address Electrical Circle alappuzha  Pre Bid Meeting Date 03-Mar-2025 10:00 AM  Bid Opening Place Electrical Circle, Alappuzha
Should Allow NDA Tender No  Allow Preferential Bidder No
 
Published Date 21-Feb-2025 10:00 AM Bid Opening Date 25-Mar-2025 11:00 AM
Document Download / Sale Start Date 21-Feb-2025 10:00 AM Document Download / Sale End Date 24-Mar-2025 11:00 AM
Clarification Start Date 21-Feb-2025 11:00 AM Clarification End Date 22-Mar-2025 03:00 PM
Bid Submission Start Date 22-Feb-2025 10:00 AM Bid Submission End Date 24-Mar-2025 11:00 AM
 
NIT Document
S.No Document Name Description Document Size (in KB)
1 Tendernotice_1.pdf   NIT 205.70
Download as zip file
Work Item Documents
S.No Document Type Document Name Description Document Size (in KB)
1 Tender Documents BidDocumentsHTUGAlappuzha.pdf Digital Signature Bid documents 601.62
2 Other Document Techspec.pdf Digital Signature other documents 577.75
3 Other Document GTP.pdf Digital Signature GTP 236.67
4 BOQ BOQ_1191832.xls Digital Signature BOQ 359.50
 
Name Deputy Chief Engineer
Address Electrical Circle alappuzha
 
 