Organisation Chain |
PWD||Chief Engineer Central Kashmir||Srinagar South Circle |
Tender Reference Number |
NIT No.213/2024/25 dt/18/02/2025 |
Tender ID |
2025_PWDJK_272811_1 |
Withdrawal Allowed |
Yes |
Tender Type |
Open Tender |
Form Of Contract |
Percentage |
Tender Category |
Works |
No. of Covers |
2 |
General Technical Evaluation Allowed |
No |
ItemWise Technical Evaluation Allowed |
No |
Payment Mode |
Offline |
Is Multi Currency Allowed For BOQ |
No |
Is Multi Currency Allowed For Fee |
No |
Allow Two Stage Bidding |
No |
|
|
Offline |
1 |
Fixed deposit |
2 |
CDR (Cash Deposit) |
|
|
|
|
|
1 |
Fee/PreQual/Technical |
All the documents as per NIT Clause 12.1a to 12.1f |
.pdf |
|
|
Scanned copy of TR as per NIT Clasue 12.1e and Annexure I |
.pdf |
|
|
Scanned copy of EMD in shape of CDR/FDR as per NIT Clause 12.1f |
.pdf |
2 |
Finance |
BOQ |
.xls |
|
|
|
|
|
|
|
|
Tender Fee in ₹
|
200 |
Fee Payable To |
EXECUTIVE ENGINEER RNB ELECTRIC DIVISION KASHMIR |
Fee Payable At |
Jammu and Kashmir |
Tender Fee Exemption Allowed |
No |
|
|
EMD Amount in ₹
|
8,560 |
EMD Exemption Allowed |
No |
EMD Fee Type |
fixed |
EMD Percentage |
NA |
EMD Payable To |
EXECUTIVE ENGINEER RNB ELECTRIC DIVISION KASHMIR |
EMD Payable At |
Jammu and Kashmir |
|
|
|
|
|
|
Title |
Construction of Girls Restroom with Canteen at GDC Tral BWO Electrification |
Work Description |
Construction of Girls Restroom with Canteen at GDC Tral BWO Electrification |
NDA/Pre Qualification |
Please refer Tender documents. |
Independent External Monitor/Remarks |
NA |
Tender Value in ₹ |
4,28,012 |
Product Category |
Electrical Works |
Sub category |
NA |
Contract Type |
Tender |
Bid Validity(Days) |
120 |
Period Of Work(Days) |
10 |
Location |
Tral |
Pincode |
192123 |
Pre Bid Meeting Place |
NA |
Pre Bid Meeting Address |
NA |
Pre Bid Meeting Date |
NA |
Bid Opening Place |
RNB ELECTRIC DIVISION KASHMIR |
Should Allow NDA Tender |
No |
Allow Preferential Bidder |
No |
|
|
Published Date |
19-Feb-2025 12:00 PM |
Bid Opening Date |
28-Feb-2025 02:00 PM |
Document Download / Sale Start Date |
19-Feb-2025 12:00 PM |
Document Download / Sale End Date |
27-Feb-2025 04:00 PM |
Clarification Start Date |
NA |
Clarification End Date |
NA |
Bid Submission Start Date |
19-Feb-2025 12:00 PM |
Bid Submission End Date |
27-Feb-2025 04:00 PM |
|
|
|
|
Name |
EXECUTIVE ENGINEER RNB ELECTRIC DIVISION KASHMIR |
Address |
RNB ELECTRIC DIVISION KASHMIR ENGINEERING COMPLEX RAJBAGH NEAR SILK FACTORY SRINAGAR |
|
|
|
|