| Organisation Chain |
Kerala Water Authority||Chief Engineer Southern Region (Trivandrum)||Superintending Engineer PH circle Pathanamthitta||Executive Engineer Project Division Adoor |
| Tender Reference Number |
01/2025-26/EE/PDA |
| Tender ID |
2025_KWA_756079_1 |
Withdrawal Allowed |
Yes |
| Tender Type |
Open Tender |
Form Of Contract |
Item Rate |
| Tender Category |
Works |
No. of Covers |
1 |
| General Technical Evaluation Allowed |
No |
ItemWise Technical Evaluation Allowed |
No |
| Payment Mode |
Online |
Is Multi Currency Allowed For BOQ |
No |
| Is Multi Currency Allowed For Fee |
No |
Allow Two Stage Bidding |
No |
|
|
|
|
|
| 1 |
Fee/PreQual/Technical/Finance |
BOQ |
.xls |
|
|
form83 |
.pdf |
|
|
preliminaryagreement |
.pdf |
|
|
specialcondition |
.pdf |
|
|
kwa liscence |
.pdf |
|
|
bid submissionletter |
.pdf |
|
|
Ipact certificate |
.pdf |
|
|
Affidavit |
.pdf |
|
|
requisition for e payment |
.pdf |
|
|
|
|
|
| |
|
|
| |
| Tender Fee in ₹
|
750 |
| Fee Payable To |
Nil |
Fee Payable At |
Nil |
| Tender Fee Exemption Allowed |
No |
|
|
| EMD Amount in ₹
|
8,479 |
EMD Exemption Allowed |
No |
| EMD Fee Type |
fixed |
EMD Percentage |
NA |
| EMD Payable To |
Nil |
EMD Payable At |
Nil |
|
|
|
| |
|
|
| |
| Title |
DEPOSIT Utility shifting of existing pipelines along Malakkara Altharapadi PMGSY RoadUtitlity shifting of 150mm G I90mm PV C80mmGIalong PMGSYroadMalakkara AltharapadiEramkadaroadC |
| Work Description |
DEPOSIT Utility shifting of existing pipelines along Malakkara Altharapadi PMGSY RoadUtitlity shifting of 150mm G I90mm PV C80mmGIalong PMGSYroadMalakkara AltharapadiEramkadaroa |
| NDA/Pre Qualification |
Please refer Tender documents. |
| Independent External Monitor/Remarks |
NA |
| Tender Value in ₹ |
3,39,170 |
Product Category |
Civil Works - Water Works |
Sub category |
NA |
| Contract Type |
Tender |
Bid Validity(Days) |
60 |
Period Of Work(Days) |
60 |
| Location |
Adoor |
Pincode |
691523 |
Pre Bid Meeting Place |
NA |
| Pre Bid Meeting Address |
NA |
Pre Bid Meeting Date |
NA |
Bid Opening Place |
Adoor |
| Should Allow NDA Tender |
No |
Allow Preferential Bidder |
No |
|
| |
| Published Date |
28-Mar-2025 06:00 PM |
Bid Opening Date |
07-Apr-2025 03:00 PM |
| Document Download / Sale Start Date |
28-Mar-2025 06:00 PM |
Document Download / Sale End Date |
05-Apr-2025 03:00 PM |
| Clarification Start Date |
NA |
Clarification End Date |
NA |
| Bid Submission Start Date |
28-Mar-2025 06:00 PM |
Bid Submission End Date |
05-Apr-2025 03:00 PM |
|
|
|
|
|
| |
| Name |
Project division Adoor |
| Address |
Executive Engineer
Project Division
Adoor |
|
| |
|
|
| |