| Organisation Chain |
UP Rajya Vidyut Utpadan Nigam Ltd||Obra Thermal Power Project- UPRVUNL- Sonebhadra |
| Tender Reference Number |
6/OMC-IV/EMD-I/BTPS/600008724 |
| Tender ID |
2025_RVUNL_1048252_1 |
Withdrawal Allowed |
Yes |
| Tender Type |
Open Tender |
Form Of Contract |
Fixed-rate |
| Tender Category |
Works |
No. of Covers |
2 |
| General Technical Evaluation Allowed |
No |
ItemWise Technical Evaluation Allowed |
No |
| Payment Mode |
Offline |
Is Multi Currency Allowed For BOQ |
No |
| Is Multi Currency Allowed For Fee |
No |
Allow Two Stage Bidding |
No |
|
|
|
|
|
| 1 |
Fee/PreQual/Technical |
TENDER NOTICE |
.pdf |
|
|
PQC |
.pdf |
| 2 |
Finance |
BOQ |
.xls |
|
|
|
|
|
| |
|
|
| |
| Tender Fee in ₹
|
1,180 |
| Fee Payable To |
DY CAO CFA BO BTPS |
Fee Payable At |
OBRA |
| Tender Fee Exemption Allowed |
No |
|
|
| EMD Amount in ₹
|
39,500 |
EMD Exemption Allowed |
No |
| EMD Fee Type |
fixed |
EMD Percentage |
NA |
| EMD Payable To |
DY CAO CFA BO BTPS |
EMD Payable At |
OBRA |
|
|
|
| |
|
|
| |
| Title |
OH of Hitachi Make 100 MVA ICT-II installed in 220KV Switchyard, Obra including Dry-Out, vacuuming and N2 process cycle and Oil Filtration |
| Work Description |
OH of Hitachi Make 100 MVA ICT-II installed in 220KV Switchyard, Obra including Dry-Out, vacuuming and N2 process cycle and Oil Filtration |
| NDA/Pre Qualification |
AS PER PQC |
| Independent External Monitor/Remarks |
NA |
| Tender Value in ₹ |
19,59,270 |
Product Category |
Electrical Works |
Sub category |
NA |
| Contract Type |
Tender |
Bid Validity(Days) |
120 |
Period Of Work(Days) |
NA |
| Location |
5X200MW BTPS OBRA |
Pincode |
231219 |
Pre Bid Meeting Place |
NA |
| Pre Bid Meeting Address |
NA |
Pre Bid Meeting Date |
NA |
Bid Opening Place |
SE IV BTPS OBRA |
| Should Allow NDA Tender |
No |
Allow Preferential Bidder |
No |
|
| |
| Published Date |
12-Jun-2025 06:50 PM |
Bid Opening Date |
18-Jun-2025 05:30 PM |
| Document Download / Sale Start Date |
12-Jun-2025 06:50 PM |
Document Download / Sale End Date |
18-Jun-2025 12:00 PM |
| Clarification Start Date |
NA |
Clarification End Date |
NA |
| Bid Submission Start Date |
12-Jun-2025 06:50 PM |
Bid Submission End Date |
18-Jun-2025 12:00 PM |
|
|
|
|
|
| |
| Name |
SE IV BTPS |
| Address |
SE IV BTPS 5X200MW OBRA |
|
| |
|
|
| |