| Organisation Chain |
UP Power Transmission Corp.Ltd (Operation)||Chief Engineer (TNE) North-East Gorakhpur||S.E., ETC, Basti |
| Tender Reference Number |
E-Tender No.23/ETC(B)/2025-26 |
| Tender ID |
2025_UPTCL_1066545_1 |
Withdrawal Allowed |
Yes |
| Tender Type |
Open Tender |
Form Of Contract |
Lump-sum |
| Tender Category |
Works |
No. of Covers |
2 |
| General Technical Evaluation Allowed |
No |
ItemWise Technical Evaluation Allowed |
No |
| Payment Mode |
Offline |
Is Multi Currency Allowed For BOQ |
No |
| Is Multi Currency Allowed For Fee |
No |
Allow Two Stage Bidding |
No |
|
|
|
| Offline |
| 1 |
DD - Demand Draft |
| 2 |
BG - Bank Guarantee |
| 3 |
FDR - Fixed Deposit |
| 4 |
RTGS - RTGS Payment |
|
|
|
|
|
| 1 |
Fee/PreQual/Technical |
TECHNICAL |
.pdf |
| 2 |
Finance |
BOQ |
.xls |
|
|
|
|
|
| |
|
|
| |
| Tender Fee in ₹
|
590 |
| Fee Payable To |
UPSEB ELECTRICITY TRANSMISSION DIVISION BASTI |
Fee Payable At |
BASTI |
| Tender Fee Exemption Allowed |
No |
|
|
| EMD Amount in ₹
|
4,200 |
EMD Exemption Allowed |
No |
| EMD Fee Type |
fixed |
EMD Percentage |
NA |
| EMD Payable To |
UPSEB ELECTRICITY TRANSMISSION DIVISION BASTI |
EMD Payable At |
BASTI |
|
|
|
| |
|
|
| |
| Title |
Providing, Fixing and Operation of Cooling fan on Auto Mode on 40MVA T/F-I (BBL Make) and T/F-II (AREVA Make) installed at 132/33 Sub-Station Bansi under ETD-II, Basti H.Q at Siddharthnagar |
| Work Description |
Providing, Fixing and Operation of Cooling fan on Auto Mode on 40MVA T/F-I (BBL Make) and T/F-II (AREVA Make) installed at 132/33 Sub-Station Bansi under ETD-II, Basti H.Q at Siddharthnagar |
| NDA/Pre Qualification |
AS PER TENDER |
| Independent External Monitor/Remarks |
NA |
| Tender Value in ₹ |
NA |
Product Category |
Electrical Works |
Sub category |
NA |
| Contract Type |
Tender |
Bid Validity(Days) |
180 |
Period Of Work(Days) |
60 |
| Location |
220 KV SUB STATION GIDAHI BASTI |
Pincode |
272002 |
Pre Bid Meeting Place |
NA |
| Pre Bid Meeting Address |
NA |
Pre Bid Meeting Date |
NA |
Bid Opening Place |
ETC-BASTI |
| Should Allow NDA Tender |
No |
Allow Preferential Bidder |
No |
|
| |
| Published Date |
19-Aug-2025 04:00 PM |
Bid Opening Date |
04-Sep-2025 01:00 PM |
| Document Download / Sale Start Date |
19-Aug-2025 04:00 PM |
Document Download / Sale End Date |
03-Sep-2025 01:00 PM |
| Clarification Start Date |
NA |
Clarification End Date |
NA |
| Bid Submission Start Date |
19-Aug-2025 04:00 PM |
Bid Submission End Date |
03-Sep-2025 01:00 PM |
|
|
|
| NIT Document |
|
Download as zip file
|
| Work Item Documents |
| 1 |
Tender Documents |
Technical23.pdf
|
TECHNICAL |
13718.42 |
| 2 |
BOQ |
BOQ_1944628.xls
|
BOQ |
238.50 |
|
|
|
| |
| Name |
SUPERINTENDING ENGINEER |
| Address |
ELECTRICITY TRANSMISSION CIRCLE, 220 KV SUB STATION, GIDAHI, BASTI |
|
| |
|
|
| |