Organisation Chain MD (Drinking Water) Peyjal Nigam GoUK||CE - Garhwal Zone||SE, Construction Circle, Pauri Garhwal||EE II CD-Kotdwar
Tender Reference Number 2087/nivida/144 dt 20-08-2025
Tender ID 2025_MDPEY_86490_1 Withdrawal Allowed Yes
Tender Type Open Tender Form Of Contract Item Wise
Tender Category Works No. of Covers 1
General Technical Evaluation Allowed No ItemWise Technical Evaluation Allowed No
Payment Mode Offline Is Multi Currency Allowed For BOQ No
Is Multi Currency Allowed For Fee No Allow Two Stage Bidding No
 
Offline
S.No Instrument Type
1 DD - Demand Draft
2 FDR - Fixed Deposit Receipt
Cover No Cover Type Description Document Type
1 Fee/PreQual/Technical/Finance NIT .pdf
Tender Document .pdf
Bill of Quantity .xls
 
 
 
Tender Fee in ₹ 4,720
Fee Payable To Executive Engineer, IInd UKPJN, Kotdwar Fee Payable At SBI/PNB kotdwar
Tender Fee Exemption Allowed No
EMD Amount in ₹ 1,50,000 EMD Exemption Allowed Yes
EMD Fee Type fixed EMD Percentage NA
EMD Payable To Executive Engineer, IInd UKPJN, Kotdwar EMD Payable At SBI/PNB kotdwar
 
 
Title Dhimki Raula and Bayela malla water supply scheme
Work Description Supply Cartage laying and jointing of Gi M pipe and reconstrucition of source and treaatment works Rikhnikhal dimki roaula and bayela malla water supply scheme in block Rikhnikhal
NDA/Pre Qualification tender document
Independent External Monitor/Remarks NA
Tender Value in ₹ NA Product Category Civil Works - Water Works Sub category gravity 
Contract Type Tender Bid Validity(Days) 90 Period Of Work(Days) NA 
Location Rikhnikhal Pincode 246149 Pre Bid Meeting Place kotdwar 
Pre Bid Meeting Address Office Of The Executive Engineer, Second Construction Division, Uttarakhand Peyjal Nigam, Kotdwar  Pre Bid Meeting Date 23-Aug-2025 03:00 PM  Bid Opening Place kotdwar
Should Allow NDA Tender No  Allow Preferential Bidder No
 
Published Date 22-Aug-2025 05:00 PM Bid Opening Date 15-Sep-2025 11:00 AM
Document Download / Sale Start Date 22-Aug-2025 05:00 PM Document Download / Sale End Date 08-Sep-2025 05:00 PM
Clarification Start Date 22-Aug-2025 05:00 PM Clarification End Date 23-Aug-2025 05:00 PM
Bid Submission Start Date 23-Aug-2025 05:00 PM Bid Submission End Date 08-Sep-2025 05:00 PM
 
NIT Document
S.No Document Name Description Document Size (in KB)
1 Tendernotice_1.pdf   NIT 234.62
Download as zip file
Work Item Documents
S.No Document Type Document Name Description Document Size (in KB)
1 Tender Documents TENDER.pdf Digital Signature Rikhnikhal Dhimki Raula and bayela Malla water supply scheme 1149.53
2 BOQ BOQ_102664.xls Digital Signature boq 304.50
 
Name Executive Engineer
Address Office Of The Executive Engineer, Second Construction Division, Uttarakhand Peyjal Nigam, Kotdwar
 
 
Click Here For Main Source