| Organisation Chain |
IGNP||ACE(B)BIKANER||SE_STAGE_II CIRCL_I |
| Tender Reference Number |
CE 04 OF 2025-26 |
| Tender ID |
2025_IGNP_507545_1 |
Withdrawal Allowed |
Yes |
| Tender Type |
Open Tender |
Form Of Contract |
Percentage |
| Tender Category |
Works |
No. of Covers |
2 |
| General Technical Evaluation Allowed |
No |
ItemWise Technical Evaluation Allowed |
No |
| Payment Mode |
Offline |
Is Multi Currency Allowed For BOQ |
No |
| Is Multi Currency Allowed For Fee |
No |
Allow Two Stage Bidding |
No |
|
|
|
|
|
| 1 |
Fee/PreQual/Technical |
As per tender documents |
.pdf |
| 2 |
Finance |
BOQ |
.xls |
|
|
|
|
|
| |
|
|
| |
| Tender Fee in ₹
|
30,000 |
| Processing Fee in ₹
|
2,500 |
| Fee Payable To |
Executive Engineer 24th Division IGNP Phalodi |
Fee Payable At |
Phalodi |
| Tender Fee Exemption Allowed |
No |
|
|
| EMD Amount in ₹
|
2,23,18,000 |
EMD Exemption Allowed |
Yes |
| EMD Fee Type |
fixed |
EMD Percentage |
NA |
| EMD Payable To |
Executive Engineer 24th Division IGNP Phalodi |
EMD Payable At |
Phalodi |
|
|
|
| |
|
|
| |
| Title |
Development of Pressure Irrigation System For Balance 3007.82 Hac. of Guru Jambheshwar Lift Canal System of IGNP Stage-II Along with Remodelling Work of GJLC System |
| Work Description |
Development of Pressure Irrigation System For Balance 3007.82 Hac. of Guru Jambheshwar Lift Canal System of IGNP Stage-II Along with Remodelling Work of GJLC System |
| NDA/Pre Qualification |
AS PER BID |
| Independent External Monitor/Remarks |
NA |
| Tender Value in ₹ |
1,11,59,00,000 |
Product Category |
Civil Works - Canal |
Sub category |
NA |
| Contract Type |
Tender |
Bid Validity(Days) |
90 |
Period Of Work(Days) |
730 |
| Location |
PHALODI |
Pincode |
342301 |
Pre Bid Meeting Place |
Bikaner |
| Pre Bid Meeting Address |
OFFICE OF THE CE IGNP BIKABER AND ON LINE AS PER LINK IN BID |
Pre Bid Meeting Date |
31-Oct-2025 03:00 PM |
Bid Opening Place |
Bikaner |
| Should Allow NDA Tender |
No |
Allow Preferential Bidder |
No |
|
| |
| Published Date |
15-Oct-2025 06:00 PM |
Bid Opening Date |
18-Nov-2025 03:00 PM |
| Document Download / Sale Start Date |
15-Oct-2025 06:00 PM |
Document Download / Sale End Date |
17-Nov-2025 06:00 PM |
| Clarification Start Date |
NA |
Clarification End Date |
NA |
| Bid Submission Start Date |
15-Oct-2025 06:00 PM |
Bid Submission End Date |
17-Nov-2025 06:00 PM |
|
|
|
| NIT Document |
| 1 |
Tendernotice_1.pdf
|
Development of Pressure Irrigation System For Balance 3007.82 Hac. of Guru Jambheshwar Lift Canal System of IGNP Stage-II Along with Remodelling Work of GJLC System
|
12951.52
|
|
|
Download as zip file
|
| Work Item Documents |
| 1 |
BOQ |
BOQ_904001.xls
|
Development of Pressure Irrigation System For Balance 3007.82 Hac. of Guru Jambheshwar Lift Canal System of IGNP Stage-II Along with Remodelling Work of GJLC System
|
447.50 |
| 2 |
Tender Documents |
GJLC.pdf
|
Development of Pressure Irrigation System For Balance 3007.82 Hac. of Guru Jambheshwar Lift Canal System of IGNP Stage-II Along with Remodelling Work of GJLC System
|
12934.73 |
|
|
|
| |
| Name |
CE IGNP Bikaner |
| Address |
CE IGNP Bikaner |
|
| |
|
|
| |