Organisation Chain PWD||Chief Engineer North Kashmir||Bandipora Circle||Bandipora Division
Tender Reference Number e NIT No.87 of 2025-26 Dated 31-01-2026
Tender ID 2026_PWDJK_301983_1 Withdrawal Allowed Yes
Tender Type Open Tender Form Of Contract Percentage
Tender Category Works No. of Covers 1
General Technical Evaluation Allowed No ItemWise Technical Evaluation Allowed No
Payment Mode Offline Is Multi Currency Allowed For BOQ No
Is Multi Currency Allowed For Fee No Allow Two Stage Bidding No
 
Offline
S.No Instrument Type
1 Demand Draft
2 CDR (Cash Deposit)
Cover No Cover Type Description Document Type
1 Fee/PreQual/Technical/Finance Upload scanned copies of all documents as per NIT .pdf
BOQ .xls
 
 
 
Tender Fee in ₹ 2,600
Fee Payable To Executive Engineer RandB Division Bandipora Fee Payable At Jammu and Kashmir Bank
Tender Fee Exemption Allowed No
EMD Amount in ₹ 3,88,240 EMD Exemption Allowed No
EMD Fee Type fixed EMD Percentage NA
EMD Payable To SE PWD RandB Circle Bandipora EMD Payable At Jammu and Kashmir Bank
 
 
Title Construction of Material Recovery facility (MRF) Shed, Platform for Composting (Post-Treatment Stage) and construction of Platform
Work Description Construction of Material Recovery facility (MRF) Shed, Platform for Composting (Post-Treatment Stage) and construction of Platform
NDA/Pre Qualification As per NIT
Independent External Monitor/Remarks NA
Tender Value in ₹ 1,94,12,000 Product Category Civil Works Sub category NA 
Contract Type Tender Bid Validity(Days) 120 Period Of Work(Days) 540 
Location Bandipora Pincode 193502 Pre Bid Meeting Place Bandipora near DC Office 
Pre Bid Meeting Address Office of Superintending Engineer PWD RandB Circle Bandipora   Pre Bid Meeting Date 05-Feb-2026 11:00 AM  Bid Opening Place Office of Superintending Engineer PWD RandB Circle
Should Allow NDA Tender No  Allow Preferential Bidder No
 
Published Date 31-Jan-2026 05:45 PM Bid Opening Date 10-Feb-2026 11:00 AM
Document Download / Sale Start Date 01-Feb-2026 10:00 AM Document Download / Sale End Date 09-Feb-2026 04:00 PM
Clarification Start Date NA Clarification End Date NA
Bid Submission Start Date 02-Feb-2026 11:00 AM Bid Submission End Date 09-Feb-2026 04:00 PM
 
NIT Document
S.No Document Name Description Document Size (in KB)
1 Tendernotice_1.pdf   Construction of Material Recovery facility (MRF) Shed Platform for Composting Post-Treatment Stage and construction of Platform 879.67
Download as zip file
Work Item Documents
S.No Document Type Document Name Description Document Size (in KB)
1 BOQ BOQ_979718.xls Digital Signature Construction of Material Recovery facility (MRF) Shed, Platform for Composting (Post-Treatment Stage) and construction of Platform As per e-NIT No.87 work No.01 299.50
 
Name Executive Engineer RandB Division Bandipora
Address Office of Xen RandB Division Bandipora
 
 
Click Here For Main Source